Deliverables

Public deliverables for this project can be found on CORDIS

Use cases description and safety critical elements

Report describing the use cases and the assessment of the safety criticalities. Each use case is comprehensively described including mission profiles, characteristics of the loads, operational requirements. Focus on describing specific use cases for large vessels using a fully DC power architecture. It includes an assessment of safety-critical elements, translating these safety requirements into technical specifications for power electronics and solid-state circuit breakers. The document also reviews relevant standards and lays the groundwork for the preliminary design of electrical systems, ensuring they meet redundancy and operational demands.

Data Management Plan

Processes and guidelines for managing research data collected or generated inside the project with potential ethics requirements, version 1 (Task 8.1). The plan will ensure that research data and outputs adhere to the FAIR principles.

Communication and Dissemination Plan

Description of the Communication and Dissemination strategy including exploitation pathways, version 1 (Task 7.1). The plan will be devised with a multi-layered approach, setting-up communication and dissemination contact points for each level of the vessel’s demonstrator to guarantee effective outreach and engagement rates.